BLU|BOX
Packaged Wastewater Treatment Plant
Pre-built, factory-tested, skid-mounted steel containerized MBR systems, complete with every process component included.
- Four BLU|BOX™ series (BLU|BOX-25, -100, -250, and -500) from 5K to 625K GPD. The BLU|BOX-100 is typically ready to ship in 6–8 weeks, with approximately 4–6 weeks for installation
- Installed permanently or temporarily, depending on the project
- Epoxy-coated carbon steel or stainless steel construction that provides 20+ year continuous life
- Purchase, rent, or lease-to-own; relocatable if the site plan changes or the system is needed at a different site
















